Electrical Department

The Electrical Inspector, John Brennan, does his inspections  on Monday thru Thursday after five p.m.

Licensed Electrician's must come to the office to complete an application and have copy of their license and workmen's compensation form.

There are two underground inspctions required.

1.  6 inches of stone dust/sand on the bottom of the trench, pipes placed on the stone dust/sand.

2.  10 inches of stone dust/sand on top of pipes, caution tape placed 8 inches from finish.

The whole trench must be left open for tape inspection which is the final inspection.